Resources Glossary

The words used on this site, defined plainly.

Sixty-nine terms from planning, ERP and SAP, data movement, checks and control, and the platform itself. Each definition is one line, with a longer explanation and the pages the term appears on. The glossary grows as pages are added; a term is included when it appears on two or more pages.

All terms

By group.

Click a term for the longer explanation, the related terms and the pages it appears on.

Planning · 16

Bill of materials (BOM)The list of components and quantities needed to make one unit of a product.BOM explosionWalking a bill of materials down every level to find the total quantity of each component needed.DFU (demand forecasting unit)In Blue Yonder, the key a forecast is built on: typically an item at a location for a channel.HierarchyA roll-up: items into families, sites into regions, weeks into months. Planning engines require each hierarchy to be strict.Key figureA numeric planning value (quantity, revenue, capacity) stored at a defined level of detail and time grain.MRP (material requirements planning)The calculation that turns demand and bills of material into planned orders for every component, level by level.Net changeA planning load that sends only what changed since the last load, in the order the target needs.OTIF (on time, in full)The share of customer order lines delivered on the promised date with the full quantity.PartSource (Kinaxis)In Kinaxis Maestro, one way to supply a part: made at a plant, bought from a supplier, or transferred from another site.PeggingThe link from a component requirement back to the customer order or forecast that caused it.Planned orderA proposal from planning to make or buy a quantity of an item by a date, which becomes a production order or purchase requisition when accepted.Planning area (SAP IBP)In SAP IBP, the container that defines master data types, key figures, the time profile and versions for a planning process.Planning master dataThe hierarchies, parameters and rules a planning application needs that the ERP does not hold.Planning parameterA setting that shapes a plan: lead-time offsets, lot sizes, minimum order quantities, sourcing priorities, safety-stock policies.Purchase requisitionAn internal request to buy something, which purchasing turns into a purchase order.Safety stockExtra stock held to cover variability in demand or supply.

ERP and SAP · 16

BAPIBusiness Application Programming Interface: an SAP function that reads or changes a business object with SAP's business logic applied.CDS viewCore Data Services view: a database view SAP defines and, for many, releases for extraction, some with delta handling.ERP (enterprise resource planning system)The system of record for orders, stock, purchasing, production and finance. SAP and Oracle are the most common in manufacturing.Extractor and delta queueA standard SAP program that prepares business data for extraction, with a queue that records what changed.IDocIntermediate Document: SAP's standard message format for exchanging business documents such as orders and deliveries.LogMinerOracle Database's own facility for reading the database change log.ODP (Operational Data Provisioning)An SAP framework that provides delta-enabled data extraction from SAP sources, designed for transfers between SAP applications.ODP RFCCalling the ODP framework over RFC from a third-party tool; the path SAP Note 3255746 prohibits and now blocks.Open interface tables (Oracle EBS)Staging tables in Oracle E-Business Suite that an import program validates and posts into the application.Production versionIn SAP, the combination of a bill of material and a routing that describes one way to make a material at a plant (table MKAL).RFC (remote function call)The protocol by which an external program calls a function inside an SAP system.SAP ECCThe SAP ERP release that preceded S/4HANA; mainstream maintenance ends December 31, 2027.SAP Note 2971304The SAP note stating that SAP does not publish or certify an interface for reading the HANA database's redo log for replication.SAP Note 3255746The SAP note that restricts third-party use of ODP over RFC; version 4 (February 2024) prohibited it, and a June 2026 patch enforces it.SAP Note 382318The SAP note stating that RFC_READ_TABLE is for test and development, and is not supported for customer use in production.SAP S/4HANASAP's current ERP, on the HANA database, run on-premise, in a private cloud or as RISE with SAP.

Data movement · 15

Apache AirflowThe open-source workflow scheduler most data teams use; Lima's orchestration runs on it.Archive, offload, retire, restoreThe lifecycle words for data that leaves an expensive system: archive it, offload cold data, retire the system, restore a dataset when needed.Change data capture (CDC)Reading only the rows that changed since the last run, from a change log, change pointers or timestamps.CheckpointThe saved position of the last completed part of a run, so an interrupted run resumes from there.DAGDirected acyclic graph: a set of tasks with dependencies and no loops; Airflow's unit of scheduling.ETL and ELTExtract, transform, load. In ETL the transform runs before the load; in ELT the raw data is loaded first and the warehouse transforms it.Micro-batchA small group of events from a stream, processed together at an interval from seconds to minutes.OrchestrationDeciding when pipelines run, in what order, and what happens when one fails or a check trips.Partition (of a table)One slice of a large table, such as one date range or one plant, read or written on its own so that many can be processed at once.PipelineA defined sequence of steps that moves data from a source to a target: connect, extract, transform, load, orchestrate, and where needed return.ReplayRe-processing kept events or rows after a fix, in their original order.Run windowThe period in which a load must run and finish, set by the business calendar: before the 06:00 MRP run, before the S&OP cut-off, before month-end close.ThroughputHow much data a run moves per unit of time: rows per minute, gigabytes per hour.Tier (32C, 64C, 96C, 128C)A reference configuration for a Lima node by vCPU count; the subscription is sized by the tier.Write keyA unique key attached to every write so that a retry updates the same row and a write is never applied twice.

Checks and control · 11

Platform · 11

A term missing?

Tell us which word on which page needed a definition; it is added within a week.