Glossary Data movement

Run window

The period in which a load must run and finish, set by the business calendar: before the 06:00 MRP run, before the S&OP cut-off, before month-end close.

In plain terms

What it means.

Run window — The period in which a load must run and finish, set by the business calendar: before the 06:00 MRP run, before the S&OP cut-off, before month-end close.

Lima treats the deadline at the end of the run window as the promise the pipeline exists to keep. A tripped check pauses the run and its deadline clock; the run resumes from its checkpoint and the report shows whether the deadline was met and by how much.

See also

Related terms and pages.

Related terms

Where it is used

/platform/backbone/orchestration

Back to the glossary.

Sixty-nine terms in five groups.