The period in which a load must run and finish, set by the business calendar: before the 06:00 MRP run, before the S&OP cut-off, before month-end close.
Lima treats the deadline at the end of the run window as the promise the pipeline exists to keep. A tripped check pauses the run and its deadline clock; the run resumes from its checkpoint and the report shows whether the deadline was met and by how much.
Sixty-nine terms in five groups.