The report at the end of a run: rows in, rows out, control totals and variance per table, with any variance routed to an owner.
Every Lima run ends with one. It is the evidence a planner, an auditor or a migration lead uses to accept a load. A redacted sample is on the outcomes page.
Sixty-nine terms in five groups.