Agentic AI Use cases

Shortages, forecasts, parameters and the schedule: where Plan-to-Produce pays first.

Plan-to-Produce turns demand into a supply plan, a schedule and finished goods, and it is the chain where analysts find the most AI already in use.

PLAN-TO-PRODUCE · FIVE PHASES · 227 DESIGNED ROLESPlan75 roles on themapCommit43 roles on themapFab Execution44 roles on themapAssembly andTest32 roles on themapQuality andInventory33 roles on themapDEPLOYING NOW · THE FOUR WORKED USE CASES, LITForecast exceptionand bias reviewA3 · PlanSafety stock andreplenishmentparameter tuningA2 · Plan and CommitShortage triage andclear-to-buildA2 · Commit and PlanProduction schedulerepair fromshop-floor signalsA3 · Commit and FabExecution179 more roles on the map, grouped by phase on this page · designed, yet to be built · each configured from the same partsagent blueprint · high-tech and semiconductor edition · the four use cases were chosen on evidence checked 23 September 2026
The chain’s five phases with their designed roles, the four use cases the market is deploying now beneath the phases they draw on, and the rest of the map as one dashed strip. Agent blueprint: designed, yet to be built.
74%
of supply chain organisations report AI capabilities in S&OP or integrated business planning (The Hackett Group, 14 May 2026)
dated source
50%+
of a planner’s time goes to sorting dashboards and filters (Kinaxis, 2 April 2025)
dated source
$1.73 trillion
a year of retail inventory distortion, out-of-stocks plus overstocks, 6.5% of sales (IHL Group, 10 September 2025)
dated source
$1.4 trillion
a year of unplanned downtime across the Fortune Global 500, 11% of revenue (Siemens, via AEMT, 1 August 2024)
dated source
The chain in the market

Where the time and the money go

Plan-to-Produce turns demand into a supply plan, a schedule and finished goods, and it is where analysts find the most AI already in use. The Hackett Group reports 74% of supply chain organisations with AI capabilities in S&OP or integrated business planning and 72% in advanced planning and scheduling (The Hackett Group, 14 May 2026) 8. Gartner sizes supply chain software with agentic AI at under $2 billion in 2025 and $53 billion by 2030 (Gartner, 7 April 2026) 5, yet expects that by 2030 only 5% of organisations implementing planning automation will make 10% of their planning decisions autonomously (Gartner, 19 May 2026) 2.

The money sits in three places. Inventory: retail inventory distortion, out-of-stocks plus overstocks, runs at $1.73 trillion a year, 6.5% of sales (IHL Group, 10 September 2025) 61. Firefighting: planners spend more than half their time sorting dashboards and filters (Kinaxis, 2 April 2025) 16; expedite spend runs at 3% of logistics cost for top performers and 10% for the rest (APQC, via Logility, 30 April 2026, a single source) 63; a demand plan still takes more than five days to build at a typical consumer goods company (McKinsey, 2 March 2022) 12. Downtime: unplanned downtime costs the Fortune Global 500 about $1.4 trillion a year, 11% of revenue (Siemens, via AEMT, 1 August 2024) 62.

The market’s own numbers set the level. IDC, for Kinaxis, finds 6% of supply chain leaders running autonomous decisions at scale today and 41% expecting to within two years, with 52% naming trust in AI decisions as a top barrier (IDC for Kinaxis, 11 August 2026) 14. Capgemini found trust in fully autonomous agents fell from 43% to 27% in a year (Capgemini, 16 July 2025) 15; Gartner placed autonomous planning past the peak of inflated expectations (Gartner, 12 November 2025) 6 and says recommendations with human approval are the norm (Gartner, 20 May 2026) 1. Read together: the market runs these agents at A1 and A2 today, grants A3 for narrow, high-volume, low-cost-of-error steps, and treats A4 as a 2030 ambition.

Deploying now

The use cases companies are deploying now

Fourteen candidates were ranked on adoption evidence, vendor offers, named customer results and measured pain. Shortage triage and clear-to-build merges the two top rows, because the agents on the market detect the mismatch and act on it in one workflow, and it has the widest vendor coverage in the chain 33 32 16. Forecast exception review and parameter tuning are the two activities Gartner names as the place to start, high in volume and low in cost of error, and both carry the most named customer numbers 1. Schedule repair is the Produce half: 72% adoption in advanced planning and scheduling 8, suites shipped for it in 2026 24 30 34, and a production scheduling SmartApp already in production use production · anonymised; its customer evidence is the thinnest of the four, and its page says so. S&OP orchestration scored high on adoption and low on what the agents do; excess diagnosis, rebalancing and allocation fold into the four, or follow below.

Each page works the use case through the six stages, names who does what at which level, and lists the settings you would make.

Additional capability

The rest of the map for this chain

Lima’s agent blueprint is a design of 960 agent roles across five end-to-end chains. It is the map of what Juno can be configured to do, and the first agents are built from it one at a time, the way the PO cancellation agent was.

Everything below is designed and yet to be built. Each role is configured from the same parts as the use cases above, and a role that matters to you can be the next agent built.

Blueprint · designed, yet to be builtEach role can be configured from the same parts as the worked use cases: an objective, a data scope, rules, a trigger, actions, limits, an escalation route and a level.
Plan 53 roles
Long-range capacity modelling A1Fab-network load balancing A2Tool capability & bottleneck view A3Capex trigger & sensitivity A1Cycle-time & WIP target setting A2Node transition & conversion plan A1Test & assembly capacity model A3Greenfield & ramp readiness A2Capacity plan-to-budget alignment A3Internal vs external capacity split A0Foundry capacity commitment A0Foundry vs devices trade-off A0Dual-source qualification status A2External cost vs internal margin A3Capacity corridor utilisation A3Sourcing-mix scenario modelling A3Product mix optimisation A2Margin & contribution analytics A3Bin-mix & grade yield planning A2Price-volume-mix simulation A3Allocation profitability ranking A2Portfolio rationalisation input A1Wafer-to-revenue yield economics A3Mix-shift early warning A3Cost roll-up & standard cost A3Cost-driver decomposition A3Variance-to-standard analytics A3Yield-to-cost sensitivity A3Absorption & idle-capacity cost A2Transfer-cost alignment A2Cost-model refresh cadence A3Should-cost challenge for subcon A2Scenario & disruption simulation A3Supply-shock impact modelling A3Demand-upside feasibility test A3Site-loss recovery planning A1Geopolitical scenario overlay A2Scenario-to-decision briefing A2Plan-resilience scoring A3Excess & obsolescence forecast A2Hub & warehouse network design A1Distribution constraint modelling A2Regional pre-positioning A2Transport mode & lane planning A3Network cost-to-serve analytics A3Distribution policy review A2S&OP cycle orchestration A3Pre-S&OP pack assembly A3Gap & action tracking A3Executive S&OP decision A0Assumption & driver documentation A3Cross-functional alignment monitor A2S&OP maturity & process audit A2
Commit 28 roles
Wafer start plan generation A3Risk-start decision (pre-qual) A0Engineering vs production split A2Start plan vs die-bank alignment A3Foundry wafer start handoff A3Start plan freeze & change control A2Start-to-output attainment watch A3Substrate & lead-frame planning A3Chemicals & gases replenishment A3Spares & consumables planning A3Obsolescence & excess review A2Bonded & consigned stock control A3Photomask demand planning A3Mask & reticle availability check A3Reticle inventory & lifecycle A3Mask shop capacity booking A2Mask revision & ECO sync A2Reticle defect & clean scheduling A3Mask cost & amortisation tracking A3Multi-project wafer coordination A2External foundry commit vs plan A3OSAT capacity booking & load A2Foundry PO-to-plan reconciliation A3Subcontract cost & liability A3Consigned material at subcon A3Partner commit confirmation A3Capacity reservation utilisation A2Partner ramp readiness check A2
Fab Execution 35 roles
Rework & scrap disposition A2Split, merge & partial lot handling A3Cross-fab lot transfer A2Labour & crew assignment A2Defect inspection data ingestion A4Yield learning & commonality A3Parametric & e-test analytics A3Wafer-level scrap decision A0Spatial & signature pattern ID A3Yield-loss cost attribution A3Yield improvement backlog A2SPC monitoring & violations A4Excursion detection & containment A2Root-cause analysis assistance A1Process window & recipe drift A3Engineering change (ECO) rollout A2Material-at-risk identification A2Excursion disposition & release A2Control-plan effectiveness review A3OEE & utilisation analytics A3PM scheduling & compliance A3Tool qualification after PM A2Spare-part consumption forecast A3Chamber matching & drift control A3Downtime coding & Pareto A4Tool-to-tool dedication rules A2AMHS & automation exceptions A3Ultrapure water & gas monitoring A3Cleanroom environment control A3Utility demand & load balancing A3Abatement & emissions monitoring A3Chemical delivery system watch A2Facility alarm triage A2Energy & water efficiency analytics A3Facility risk & redundancy review A1
Assembly and Test 32 roles
A&T lot release & sequencing A3Bump & wafer-level packaging A2Substrate matching & pairing A3Assembly yield & defect tracking A3Package qualification evidence A2Marking, laser & traceability A4Die-attach & wire-bond control A3Assembly capacity attainment A3Advanced packaging (2.5D / 3D) A2Known-good-die selection A2Chiplet & interposer pairing A2Stacked-die yield modelling A3HBM / memory stack coordination A2Warpage & thermal control A3Multi-die traceability A3Advanced-package qual evidence A2Test capacity & handler schedule A3Burn-in load planning A3Bin-mix optimisation to demand A2Retest & correlation decisions A2Final grade & speed-bin assign A3Test floor WIP & queue control A3Handler & probe-card readiness A3Test attainment reporting A3Test program version control A2Test data ingest & PAT limits A4Outlier & maverick screening A3Test escape & DPPM analytics A3Test-time reduction analysis A3Correlation & golden-unit tracking A2Probe-card yield diagnostics A3Test coverage gap analysis A2
Quality and Inventory 31 roles
Product qualification evidence A2Reliability test monitoring (HTOL) A3PCN / PPAP change management A2Nonconformance & CAPA tracking A2Customer audit evidence assembly A3Functional-safety compliance A2Field failure & FA linkage A2Quality release & disposition A0Customer PPM & complaint trend A3Die bank position & aging A3Inventory reserve input A2Cycle count & reconciliation A3Slow-moving & excess disposition A2Hub & warehouse stock balancing A3Inventory valuation data feed A3Foundry WIP & milestone ingest A3OSAT WIP synchronisation A3Yield & quality data ingestion A3Partner excursion notification A2Cross-source lot traceability A3Partner scorecard & attainment A3Subcon inventory reconciliation A3Partner escalation & recovery A1Lot genealogy & pedigree capture A4Batch record completeness check A3Device history record assembly A3Traceability query response A4Record retention & archive A4Audit trail integrity monitoring A3Serialisation & marking records A3Recall trace simulation A2
Measured

How the chain is measured

MeasureWhat it shows
Clear-to-build share, next ten working daysWhether the plan can be built; the shortage agent’s objective in one number
Forecast accuracy and bias by item-location and lagWhether the demand plan is right, and whether overrides help or harm it
Share of item-locations touchless each cycleHow much of the plan runs delegated, and how much still needs a planner
Service level and days of inventory by segmentWhether the parameters hold the target at the lowest inventory value
Expedite and premium freight as a share of logistics costThe price of firefighting: 3% at top performers against 10% (APQC, via Logility)
Minutes from disruption signal to approved rescheduleHow fast the floor recovers; hours by hand
Actions executed within rules, approved, edited or rejectedThe record that moves an agent up the ladder, per agent and per 1,000 decisions
Next chain
The question this leaves

The plan is right, the parameters are current and the floor keeps its dates. At month end all of it becomes numbers that finance has to close. Does the same machinery serve the ledger?

Answered next

Record-to-Report

Reconciliations, journal anomalies, accruals and variance commentary: the four use cases finance is deploying now, with the evidence.

Sources

Dated sources used on this page

  1. [1] Gartner, Gartner Warns of Agent Washing Risks in Supply Chain Planning Technology Market, 20 May 2026 (checked 23 September 2026) · https://www.gartner.com/en/newsroom/press-releases/2026-05-20-gartner-warns-of-agent-washing-risks-in-supply-chain-planning-technology-market
  2. [2] Gartner, Gartner Supply Chain Symposium/Xpo 2026 Barcelona: Day 2 Highlights, 19 May 2026 (checked 23 September 2026) · https://www.gartner.com/en/newsroom/press-releases/2026-05-19-gartner-supply-chain-symposium-xpo-barcelona-day-2-highlights
  3. [5] Gartner, Gartner Forecasts Supply Chain Management Software with Agentic AI Will Grow to $53 Billion in Spend by 2030, 7 April 2026 (checked 23 September 2026) · https://www.gartner.com/en/newsroom/press-releases/2026-04-07-gartner-forecasts-supply-chain-management-software-with-agentic-ai-will-grow-to-53-billion-in-spend-by-2030
  4. [6] Gartner, Gartner Says Autonomous Planning Has Passed the Peak of Inflated Expectations on Supply Chain Planning Technology Hype Cycle, 12 November 2025 (checked 23 September 2026) · https://www.gartner.com/en/newsroom/press-releases/2025-11-12-gartner-says-autonomous-planning-has-passed-the-peak-of-inflated-expectations-on-supply-chain-planning-technology-hype-cycle
  5. [8] The Hackett Group, Supply Chain AI Adoption Becomes Pervasive as Cost and Modernization Pressures Intensify (2026 Supply Chain Key Issues Study), 14 May 2026 (checked 23 September 2026) · https://www.thehackettgroup.com/the-hackett-group-supply-chain-ai-adoption-becomes-pervasive-as-cost-and-modernization-pressures-intensify/
  6. [12] McKinsey, Autonomous supply chain planning for consumer goods companies, 2 March 2022 (checked 23 September 2026) · https://www.mckinsey.com/capabilities/operations/our-insights/autonomous-supply-chain-planning-for-consumer-goods-companies
  7. [14] Kinaxis (IDC study), Kinaxis-Sponsored Study Identifies Supply Chain AI Accountability Gap, 11 August 2026 (checked 23 September 2026) · https://www.kinaxis.com/en/news/press-releases/2026/kinaxis-sponsored-study-identifies-supply-chain-ai-accountability-gap
  8. [15] Capgemini Research Institute, Trust and human-AI collaboration set to define the next era of agentic AI (press release), 16 July 2025 (checked 23 September 2026) · https://www.capgemini.com/news/press-releases/trust-and-human-ai-collaboration-set-to-define-the-next-era-of-agentic-ai-unlocking-450-billion-opportunity-by-2028/
  9. [16] Kinaxis, AI agents are here: how they change the way we manage supply chains (blog), 2 April 2025 (checked 23 September 2026) · https://www.kinaxis.com/en/blog/ai-agents-are-here-and-theyre-game-changer-how-we-manage-supply-chains
  10. [24] SAP, SAP Innovation Guide H2 2025 (Production Planning and Operations Agent entry), H2 2025 (page carries the half-year only) (checked 23 September 2026) · https://www.sap.com/topics/innovation-guide/h2
  11. [30] Oracle, Oracle Introduces Fusion Agentic Applications for Finance and Supply Chain, 9 April 2026 (checked 23 September 2026) · https://www.oracle.com/news/announcement/oracle-introduces-fusion-agentic-applications-for-finance-and-supply-chain-2026-04-09/
  12. [32] Oracle, AI Agents for Oracle Fusion Cloud Applications (product page listing the agents), page carries the current year only (checked 23 September 2026) · https://www.oracle.com/applications/fusion-ai/ai-agents/
  13. [33] Blue Yonder (Business Wire), Blue Yonder Transforms Supply Chain Management With New AI Agents and Supply Chain Knowledge Graph at ICON 2025, 5 May 2025 (checked 23 September 2026) · https://www.businesswire.com/news/home/20250505924588/en/Blue-Yonder-Transforms-Supply-Chain-Management-With-New-AI-Agents-and-Supply-Chain-Knowledge-Graph-at-ICON-2025
  14. [34] Blue Yonder (Business Wire), Blue Yonder Launches New Cognitive Solutions and AI-Driven Innovations at ICON 2026, 19 May 2026 (checked 23 September 2026) · https://www.businesswire.com/news/home/20260519113371/en/Blue-Yonder-Launches-New-Cognitive-Solutions-and-AI-Driven-Innovations-at-ICON-2026
  15. [61] IHL Group, Retail Inventory Crisis Persists Despite $172 Billion in Improvements, 10 September 2025 (checked 23 September 2026) · https://www.ihlservices.com/news/analyst-corner/2025/09/retail-inventory-crisis-persists-despite-172-billion-in-improvements/
  16. [62] AEMT (summarising the Siemens True Cost of Downtime 2024 report), The True Cost of Downtime 2024: A Comprehensive Analysis, 1 August 2024 (checked 23 September 2026) · https://www.theaemt.com/resource/the-true-cost-of-downtime-2024-a-comprehensive-analysis.html
  17. [63] Logility (blog citing APQC Open Standards Benchmarking and McKinsey), The Real Cost of Expedited Freight in Your Supply Chain, 30 April 2026 (checked 23 September 2026) · https://www.logility.com/blog/the-real-cost-of-expedited-freight-in-your-supply-chain/

See Juno answer and act on your own data

Bring two systems and one decision your planners make every week. In the first week we register the data, confirm the mapping with your team, answer your questions in ChatLima and run the first agent at the level you choose.