In Kinaxis Maestro, one way to supply a part: made at a plant, bought from a supplier, or transferred from another site.
A part can have several PartSources, each with its own bill of material and lead time. SAP production versions, info records and source lists map to PartSources; getting that mapping right is the hardest part of an SAP-to-Kinaxis first load.
Sixty-nine terms in five groups.