A planning load that sends only what changed since the last load, in the order the target needs.
After the first full load, a planning application receives the differences: new orders, changed quantities, closed receipts, new items. Net change keeps the load small and the run window short. The rows must arrive in referential order: an item before its bill of material, a source before its components.
Lima builds the net change from the ERP's change capture and checks the referential order before loading.