Agentic AI Use cases

Every end-of-life notice caught, sized and answered while the last order date is open.

End-of-life, EOL, is a manufacturer ending a part. A product change notice, a PCN, is the warning that should come first, and in 2025 it came for under half of the parts that ended.

WHAT JUNO’S ROLES WOULD DO WHEN A PART GOES END-OF-LIFE01A notice arrivese-mail, a distributorfeed, or the nightlylifecycle scan02Match the partmanufacturer part tointernal item; where-usedon active BOMs03Size the exposurestock and open ordersagainst demand to the endof production life04Propose the patha qualified alternate, alast-time buy, or aredesign case05Open the actionsa change request in PLMand a requisition in theERP, for approvalthe board’s choice against the recommendation is recorded and used
A notice names a manufacturer part; the ERPs and the PLM system know it by their own numbers; the exposure lives in stock, orders and demand. Juno’s roles would join them on one case. Designed, yet to be built.
620,000+
electronic parts discontinued in 2025, about 150,000 more than two years earlier (Z2Data, 13 March 2026)
dated source
52%
of those parts reached end-of-life before any product change notice was issued (Z2Data, 13 March 2026)
dated source
$1.09M
mean cost of one redesign to resolve an obsolete part, across 4,562 reported issues (US Department of Commerce BIS, 2015)
dated source
38,000
units in one showcase last-time buy, worth $214,000, drafted the afternoon the notice arrived
showcase estate
A moment in the day

Where this use case starts

DO
Thursday 16:20 · a distributor notice · the memory part on controller board 7741-X

At 16:20 a distributor notice arrives by e-mail: a memory part goes end-of-life with a last order date in March. Juno reads the manufacturer part number from the notice, matches it to item 7741-M2 in SAP S/4HANA and to the same part under its own number in the Oracle Fusion division, and finds it on nine active bills of materials.

The exposure is on the record within the hour: 14 weeks of stock at plant 1210 against 60 weeks of remaining demand to the end of production life, and one open purchase order line. One qualified alternate from Acme Components GmbH is already on the approved manufacturer list for a sister board. Juno drafts a last-time buy of 38,000 units worth $214,000 and a change request for the alternate.

D. Okafor, buyer, sees the requisition in his queue with the demand curve and the distributor’s allocation, and approves it at 16:50. The product engineer approves the alternate for qualification. On Monday the obsolescence board chooses the alternate for new builds and the buy for the rest, and the case record holds every step. showcase estate

Why this is a top use case

What the market is doing, with the evidence

The scale is a data vendor’s count, and it is large. Manufacturers discontinued over 620,000 electronic parts in 2025, about 150,000 more than two years earlier; 323,286 of them, 52%, reached end-of-life before any product change notice was issued, and 27% of the notices met the standard of JEDEC, the electronics industry’s standards body (Z2Data, 13 March 2026) 22. Components now last two to five years on average before discontinuation (Z2Data, 22 January 2026) 23.

The cost baselines are older, and they come from government surveys. Resolving one obsolete part cost a mean $5,234 as a life-of-need buy, $25,410 as a complex substitute, $1.09 million as a next-higher-assembly redesign and $10.3 million as a system replacement, across 4,562 reported issues (US Department of Commerce BIS, 2015) 25. An alternate source took 11 weeks and a redesign 42 to 64 weeks (US BIS, September 2010) 26.

Vendors sell pieces of the answer. Oracle ships a Component Replacement agent that reads part numbers from change notices, runs where-used and adds use-up detail to the change request (Oracle, 10 February 2026; Oracle, 30 July 2026) 5, 6. Propel One flags replacements from live quality and supply data, notifies engineers and triggers change orders, with Allegro MicroSystems an early adopter, on a single source (Propel, 9 October 2025) 14. SiliconExpert and Z2Data sell alerting, years-to-end-of-life forecasting and alternates (SiliconExpert, checked 23 September 2026) 24, and PTC Arena adds supply chain intelligence for risk visibility (PTC Arena, 11 August 2026) 18.

The adoption signal is indirect. Semiconductor executives put procurement and supply chain first for future generative AI deployments (KPMG, 19 March 2026, 151 executives) 50. 66% of manufacturing professionals say AI is mostly ineffective unless it can reach product data (ASSEMBLY, 25 August 2026) 15. The case for the platform is that a notice touches the data service, the product lifecycle management (PLM) system, two ERPs, the planning suite and the distributor portal, and each vendor’s agent sees one of them.

By hand today

How it is done today

Notices arrive by e-mail from manufacturers and distributors or as alerts from a component data service, and a component engineer logs them in a tracker. The engineer matches each manufacturer part number to internal items in PLM and ERP, then runs where-used across active bills of materials at every plant. A planner pulls stock, open purchase orders and demand to the end of production life and works out the use-up date and the last-time-buy quantity.

The component engineer searches for alternates of the same form, fit and function and checks their qualification status. A buyer requests distributor quotes and checks allocation and lead time. An obsolescence review board chooses between last-time buy, alternate and redesign. A change order is raised, the approved manufacturer list is updated and the purchase order is placed. Weeks to months per case: 11 weeks for an alternate source and 40 for a complex substitute (US BIS, September 2010) 26, while half the parts reach end-of-life before a notice arrives (Z2Data, 13 March 2026) 22.

Week 0
A notice, when one comesAn e-mail from a distributor or an alert from the data service; a component engineer logs it in a tracker.
Weeks 1 to 2
Match and where-usedManufacturer part number to internal items in PLM and each ERP, then where-used at every plant, by hand.
Weeks 2 to 4
Exposure and optionsStock, open orders and demand to end of life; alternates searched and their qualification checked; quotes requested.
Weeks 4 to 6
The board decidesLast-time buy, alternate or redesign; then a change order, the approved manufacturer list and the purchase order.
Week 11
An alternate source in place11 weeks for an alternate source and 40 for a complex substitute (US BIS, September 2010).

Illustrative weeks for a case done by hand; the 11-week and 40-week figures are US BIS, September 2010 26.

Stage by stage

How Juno enables it

This is the use case where the platform’s map across systems does most of the work: the notice names a manufacturer part, the ERPs know it by internal item numbers, the PLM system by its own, and the exposure lives in stock, orders and demand across plants. The six stages below say how those would be joined, and who would approve the buy and the alternate.

01
Register
The component data service feed, the notice inbox, PLM item and manufacturer part tables, the material master, approved manufacturer list, stock, purchasing and demand tables in SAP S/4HANA and Oracle Fusion, the planning suite’s forecast and the distributor portal, all read in place. Objects: notice, manufacturer part, approved manufacturer entry, internal item, where-used, lifecycle status, stock, open purchase order line, demand to end of life, use-up date, last-time-buy quantity, alternate part, distributor quote, change request.
02
Map
Manufacturer part, approved manufacturer entry, lifecycle status, notice and last-time-buy quantity would be added to the ontology where the client’s model lacks them; item, bill of materials, stock, purchase order line and forecast exist already. The link between the manufacturer part number and each system’s internal item number is proposed with a confidence, and the component engineer confirms it.
03
Ask
“Which parts on active BOMs carry an end-of-life or last-time-buy notice, and how many weeks of demand do we hold?” and “Which boards use item 7741-M2, and which of them have a qualified alternate on the approved manufacturer list?” The answer shows the systems read and the query.
04
Teach
LTB for last-time buy, PCN for product change notice, “use-up”, the company’s own lifecycle codes and the data service’s status words, so that “last order date” in a distributor’s e-mail and “LTB date” in the tracker are read as one thing. The team’s names for the obsolescence board and its review cycle would be taught too.
05
Act
Trigger: a notice arrives by e-mail or feed, or the nightly scan finds a lifecycle change or a years-to-end-of-life forecast under the threshold on an active part. The policy is the sentence in the card below: size the exposure, propose the qualified alternate, draft a last-time buy where the alternate is missing or late. It would be released at A2, the buyer and the component engineer approving. Write-back: the change request to PLM and the requisition to the ERP, each returning its identifier.
06
Learn
The board’s choice against the recommendation would be recorded each time, with the exposure and the options as they stood. The measure that improves is time from notice to resolution, against the 11 to 64 weeks by path in the baseline; the last-time-buy write-off a year later is the check on the quantities, and it feeds the demand rule.
End-of-life policyA2 Supervisedblueprint
When a part in an active bill of materials reaches end-of-life or carries a last order date, compute the exposure to the end of production life; propose the qualified alternate with the lowest change cost; draft a last-time buy where an alternate is missing or takes longer than the notice window. Ask the buyer above $25,000 and finance above $150,000.
What it compiles to: the planning table
RowKindWhat it tests or doesData it readsThen
01CheckThe manufacturer part matches an internal item on an active bill of materialsmanufacturer part number, approved manufacturer list, BOM statuscarry on; an unmatched part goes to the component engineer
02CheckThe lifecycle status is end-of-life, or the last order date falls inside 12 monthsnotice, data-service status, last order datecarry on
03ActionCompute the exposure: stock and open orders against demand to the end of production life, per plantstock, open purchase order lines, demand forecast, end-of-production daterow 04
04ActionPropose the qualified alternate with the lowest change cost; draft a last-time buy where an alternate is missing or takes longer than the notice windowalternate parts, qualification status, lead time, distributor quotesrow 05 decides the route
05LimitRequisition value against $25,000 and $150,000requisition valueunder $25,000: the buyer’s queue · above: the buyer, and finance above $150,000
Designed, yet to be builtApprovers: the component engineer and D. OkaforWould be simulated on last year’s notices

The policy sentence and the planning table it would compile to. Illustrative values; the mechanics are the product’s.

Who does what

The person and the agent

The agent A2 Supervised
  • Reads each notice or feed alert, matches the manufacturer part to the internal items and finds every active BOM it sits on
  • Sizes the exposure: stock and open orders against demand to the end of production life, per plant
  • Proposes the qualified alternate with the lowest change cost, or drafts the last-time buy with its quantity and value
  • Opens the change request in PLM and the requisition in the ERP after approval, and keeps each acknowledgement
a case with the exposure, the options and a drafted buy; then the path, chosen by name
The person
  • The component engineer confirms the part match and the affected bill-of-materials set on each new notice
  • The obsolescence board or the product line manager chooses the path: last-time buy, alternate or redesign
  • D. Okafor, buyer, approves the requisition above the value threshold; J. Harrison, finance, approves inventory value above the budget line
  • The design or quality engineer approves the alternate for qualification; an auditor samples the case trace

The market runs this from inform to draft-and-approve: the data services alert and forecast, one ERP vendor’s agent analyses and e-mails, and one PLM vendor’s flags, notifies and triggers change orders that people approve (2025 to 2026) 5, 14, 24. The blueprint designs the write-back roles at A2, with the buyer and the component engineer as named approvers: lifecycle and EOL trigger watch, long-lead material commitment and product change notice issuance at A2, the supply readiness scorecard at A3, and the two impact assessment roles at A3 because they read before anyone writes.

What you would configure

The settings on this agent

Agent settings · Component end-of-life watch with alternates
ElementSettingSet byChanges
ObjectiveEvery end-of-life or product change notice on a part in an active bill of materials is caught, sized and answered inside its notice windowThe component engineering lead, in a sentenceNew version
Data scopeComponent data service, notice inbox, PLM items and manufacturer parts; SAP S/4HANA and Oracle Fusion material master, approved manufacturer list, stock, purchasing and demand; distributor portalA. Novak, data leadNew version
RulesThe end-of-life policy and its planning table: exposure to end of production life; the qualified alternate with the lowest change cost; a last-time buy where the alternate is missing or lateThe component engineering lead with the Planner AgentNew version, simulated first
TriggerOn each notice or feed alert; a nightly scan at 02:00 for lifecycle changes and years-to-end-of-life forecasts under two years on active partsThe component engineering leadAt once
Actions permittedOpen a case · write a change request to PLM · draft a requisition · update the approved manufacturer list after approval · block a part for new designs · notify a distributor · draft a PCNThe component engineering lead, ownerNew version
LimitsRequisitions above $25,000 go to the buyer with the demand curve · above $150,000, finance as well · a buy covers demand to end of life plus 10% · confidence floor 0.85 on a part matchThe component engineering lead and J. Harrison, financeNew version
EscalationA part on a product in ramp, to the programme manager at once · an unmatched manufacturer part, to the component engineer · a failed write-back, to the ownerThe component engineering leadAt once
LevelA2 Supervised with D. Okafor approving requisitions and the component engineer approving part matches and alternatesThe engineering directorUp on evidence, down in one step
FeedbackThe board’s choice against each recommendation is recorded and usedAlways onFixed

Every row is a setting or a versioned rule; the level and the limits are the ones a manager signs.

Built from the blueprint

The roles this use case would draw on

Lima’s agent blueprint is a design of 960 agent roles across five end-to-end chains. It is the map of what Juno can be configured to do, and the first agents are built from it one at a time, the way the PO cancellation agent was.

Blueprint · designed, yet to be builtThese roles are designed on the map. Each is configured from the same parts.
Launch 5 roles
Lifecycle & EOL trigger watch A2
Long-lead material commitment A2
Product change notice issuance A2
Supply readiness scorecard A3
Roadmap feedback loop A2
Conceive 1 role
Requirement change impact A3
Design 1 role
Design change impact assessment A3

Additional capability in Idea-to-Market lists the rest of the map for this chain.

How it is measured

The measures that show it working

Measure
Notices caught against parts reaching end-of-life, baseline: 52% of parts reached end-of-life before a notice in 2025 (Z2Data)
Time from notice to resolution, baseline 11 to 64 weeks by path (US BIS, 2010)
Cost per resolution, baseline $5,234 to $10.3 million by path (US BIS, 2015)
Share of active bill-of-materials parts with lifecycle risk
Last-time-buy inventory value and later write-off
Line-down events caused by obsolescence

Baseline notices caught against parts reaching end-of-life first, because it says whether the watch works at all: how many of last year’s end-of-life parts on active bills had a notice on record before the last order date, against the market count, where 52% of parts reached end-of-life before a notice 22. Time from notice to resolution follows, by path; the write-off on last-time-buy stock takes a year to read.

Terms on this page
End-of-life (EOL)A manufacturer’s decision to stop making a part, usually with a last order date and a last ship date.
Product change notice (PCN)The notice a manufacturer sends before it changes or ends a part; JEDEC sets its standard.
Last-time buy (LTB)The final purchase of an ending part, sized to cover demand to the end of production life.
Approved manufacturer listThe manufacturer parts approved for an internal item; an alternate joins it after qualification.
Years to end-of-lifeA data service’s forecast of how long a part stays in production, watched before a notice arrives.
Questions
What about a part whose notice fails to arrive?

The nightly scan watches the data service’s lifecycle status and its years-to-end-of-life forecast on every active part, so a part that ends quietly still opens a case when its status changes or its forecast drops under the threshold.

Who chooses between a last-time buy, an alternate and a redesign?

The obsolescence review board or the product line manager, at the weekly review, with the exposure and the options on one page. Juno proposes; the choice is recorded against the proposal and used next time.

How is the last-time-buy quantity checked?

Against demand to the end of production life from the planning suite, plus the policy’s allowance, and against the distributor’s allocation. D. Okafor approves above $25,000 and J. Harrison above $150,000; the write-off a year later is read back against the buy.

Next in this chain
The question this leaves

The alternate is qualified and the last-time buy is placed. Twelve weeks before a launch, what else has to be true before the first production order can be released?

Answered next

Launch readiness checks across supply, quality and data

Every readiness item, from long-lead orders to part numbers and test program release, checked daily against its source, fixed within rules or routed to its owner.

Sources

Dated sources used on this page

  1. [5] Oracle, Oracle AI Agents Help Supply Chain Leaders Boost Efficiency and Strengthen Resiliency, 10 February 2026 (checked 23 September 2026) · https://www.oracle.com/news/announcement/oracle-ai-agents-help-boost-supply-chain-efficiency-and-strengthen-resiliency-2026-02-10/
  2. [6] Oracle Help Center, Oracle Fusion Cloud Product Lifecycle Management 26A What's New: Improved Component Replacement Assistant, 30 July 2026 (checked 23 September 2026) · https://docs.oracle.com/en/cloud/saas/readiness/scm/26a/plm26a/26A-plm-wn-f42907.htm
  3. [14] Propel Software, Propel Software Accelerates Adoption of Agentic AI for PLM, QMS & PIM with Early Customers Using Live Data, 9 October 2025 (checked 23 September 2026) · https://www.propelsoftware.com/news/propel-accelerates-agentic-ai-adoption
  4. [15] ASSEMBLY Magazine (Propel Software survey of 400 senior manufacturing professionals), Manufacturers Rank PLM as Top Data Source for AI Agents, 25 August 2026 (checked 23 September 2026) · https://www.assemblymag.com/articles/100340-manufacturers-rank-plm-as-top-data-source-for-ai-agents
  5. [18] PTC Arena (blog quoting the Gartner Magic Quadrant for PLM Software in Discrete Manufacturing Industries, 9 June 2026), PTC (Arena) Named a Visionary in the 2026 Gartner Magic Quadrant for PLM in Discrete Manufacturing Industries, 11 August 2026 (checked 23 September 2026) · https://www.arenasolutions.com/blog/arena-2026-gartner-magic-quadrant-plm-visionary/
  6. [22] Z2Data, Components Are Going EOL Without Product Change Notifications at Alarming Rates, 13 March 2026 (checked 23 September 2026) · https://www.z2data.com/insights/components-are-going-eol-without-product-change-notifications-at-alarming-rates/
  7. [23] Z2Data, The Real Reasons Component Obsolescence Is Happening Faster Than Ever, 22 January 2026 (checked 23 September 2026) · https://www.z2data.com/insights/the-reasons-component-obsolescence-happening-faster-than-ever
  8. [24] SiliconExpert, Obsolescence Management (product page), undated, checked 23 September 2026 (checked 23 September 2026) · https://www.siliconexpert.com/manage-obsolescence/
  9. [25] US Department of Commerce, Bureau of Industry and Security, DMSMS Cost Metrics Report (2014 survey, 28 organisations, 4,562 issues), 2015 (checked 23 September 2026) · https://www.bis.gov/media/documents/dmsms-cost-metrics-report-2015-final.pdf
  10. [26] US Department of Commerce, Bureau of Industry and Security, Final Report: DMSMS NRE Cost Metric Update, September 2010 (checked 23 September 2026) · https://www.bis.gov/media/documents/cost-metric-final1.pdf
  11. [50] KPMG (survey of 151 semiconductor executives), Global semiconductor industry outlook 2026, 19 March 2026 (checked 23 September 2026) · https://kpmg.com/us/en/articles/2026/global-semiconductor-industry-outlook-2026.html

See Juno answer and act on your own data

Bring two systems and one decision your planners make every week. In the first week we register the data, confirm the mapping with your team, answer your questions in ChatLima and run the first agent at the level you choose.