Lets a planner move firmed production orders on a live schedule, shows the effect on components and customer dates, collects the signatures and writes the new dates to the ERP.
Tables are read in place through the SAP connector, using released read interfaces; changed rows arrive through change capture where the basis team allows it. The rows stay in SAP.
| Object | Read from | Fields the app uses | Freshness |
|---|---|---|---|
| Production order | AFKO · AFPO · AFVC | AFKO.AUFNR (number) · AFPO.MATNR (material) · AFPO.PSMNG (qty) · AFKO.GSTRP (start) | live; change capture where enabled |
| Planned order | PLAF | PLAF.PLNUM (number) · PLAF.MATNR (material) · PLAF.GSMNG (qty) · PLAF.PSTTR (start) | live; change capture where enabled |
| Sales order line | VBAK · VBAP · VBEP | VBAK.VBELN (number) · VBAP.POSNR (line) · VBAK.KUNNR (customer) · VBAP.MATNR (material) | live; change capture where enabled |
| Stock position | MARD · MCHB · MATDOC_EXTRACT | MARD.MATNR (material) · MARD.WERKS (plant) · MARD.LGORT (sloc) · MARD.LABST (on hand) | live; change capture where enabled |
| Routing | PLKO · PLPO · CRHD | PLKO.PLNNR (group) · PLPO.VORNR (operation) · CRHD.ARBPL (work center) · PLPO.VGW01 (setup) | live; change capture where enabled |
In plain words: A planner or production lead starts a change on S01 for a work center and a window; a breakdown recorded on the floor screen starts one as well.
This app starts from a screen, so the first read happens when the instance opens; the criteria on the arrows use the fields above.
A planner or production lead starts a change on S01 for a work center and a window; a breakdown recorded on the floor screen starts one as well. The instance then reads its rows from S/4HANA through the handlers above.
Writes go through released BAPIs and IDocs. Each call returns a document number or an error message, and the app records both beside the decision.
| Object | What changes | Interface |
|---|---|---|
| Production order | start and finish dates changed through the production order interface | BAPI_PRODORD_CHANGE · BAPI_PRODORDCONF_CREATE_TT |
| Planned order | firmed planned orders rescheduled | BAPI_PLANNEDORDER_CHANGE · BAPI_PLANNEDORDER_CREATE |
| Sales order line | confirmed dates updated on the affected customer orders | BAPI_SALESORDER_CHANGE · BAPI_SALESORDER_CREATEFROMDAT2 |
Each write stores the identifier S/4HANA returns beside the decision, the person and the time, so the log answers who changed what, and the reconciliation shows it arrived.
SAP roles are mapped to Lima access policies once. A buyer who sees purchasing organisation 1000 in SAP sees the same rows in the app.
On SAP ECC the same objects live in the classic tables named beside each row; MATDOC becomes MKPF and MSEG, ACDOCA becomes BKPF and BSEG. The BAPIs are the same.
| Object | On S/4HANA | On SAP ECC |
|---|---|---|
| Production order | AFKO · AFPO · AFVC | same tables |
| Planned order | PLAF | same table |
| Sales order line | VBAK · VBAP · VBEP | same tables |
| Stock position | MARD · MCHB · MATDOC_EXTRACT | MARD · MCHB · MBEW |
| Routing | PLKO · PLPO · CRHD | same tables |
The screens read through handlers that leave the rows in S/4HANA. History the app needs at scale is landed in the lake by the Backbone, which is the exception by design.
The prerequisites above: an integration identity with read rights on the objects listed and write rights on the interfaces named, connectivity, and the scopes agreed with the process owner.
Yes. The screens, criteria and roles stay; the handlers are re-bound to the other system's objects, listed above.
Bring the process and the systems it touches. In the first session we register the data handlers, draw the levels or the lanes and run the first screen on your live rows.